Changhong International has a comprehensive layout in Dinghai, Putuo and Daishan. The three bases cover a total area of more than 580 million square meters, with a total coastline of more than 12400 meters, a total investment of more than 10 billion yuan, an annual shipbuilding capacity of 3 million deadweight tons and an annual ship repair capacity of more than 600 ships. It has formed a new pattern of ship-based, integrated construction and coordinated development.

The three bases have 12 300000-ton, 100000-ton and 80000-ton dry docks, 2 150000-ton horizontal docks and 12 outfitting docks.

It has 2 900-ton gantry cranes, 1 800-ton gantry crane, 1 600-ton gantry crane, 2 500-ton gantry cranes, 11 high-horsepower tugboats and supporting lifting equipment and facilities. It has large-scale production workshops and steel structure production sites such as pretreatment processing workshop, segmented production workshop, outfitting workshop, painting workshop, mechanical and electrical special repair workshop, etc. It has the conditions and capabilities to build, refit and repair various ships and marine engineering equipment at home and abroad.

Changtu Factory Area

Changtu Factory Area

Dinghai Headquarters

Dinghai Headquarters

Putuo Changhong

Putuo Changhong

Jiangnan Mountain Factory Area

Jiangnan Mountain Factory Area

Jiangnan Mountain Factory Area

Jiangnan Mountain Factory Area

Construction, repair, and dismantling of bases Dock, harbor pool
NO. Size/m (L*B) Tonnage (DWT) Lifting capacity
Shipbuilding Dinghai Changhong No. 1 Dock 380*105 300000 900T*1set
150T*2sets
No. 2 Dock 380*40 80000 900T*1set
150T*2sets
Floating dock 236*47 150000 50T*1set
Daishan Changhong No. 6 Dock 380*68 300000 450T*1set
50T*75m*2sets
No. 7 Dock 380*80 300000 450T*1set
50T*75m*1set
Ship repair Putuo Changhong No. 1 Dock 285*30 30000 600T*1set
300T*1set
150T*1set
No. 2 Dock 325*39 80000 300T*3sets
150T*2sets
No. 3 Dock 340*42 100000 300T*2sets
50T*2sets
- - - -
Daishan Changhong No. 2 Dock 400*80 300000 300T*2sets
150T*1set
No. 3 Dock 240*40 80000 300T*1set
150T*1set
No. 4 Dock 310*54 150000 300T*2sets
150T*1set
No. 5 Dock 510*120 500000 800T*2sets
150T*4sets
Ship dismantling Dinghai Changhong No. 1 Harbor Pool 610*120 300000 40T*6sets
No. 2 Harbor Pool 475*120 100000 40T*4sets


1. A new 1000-ton gantry crane will be added to Dinghai Changhong Dock, scheduled for completion and delivery in March 2024.
2. A new floating dock will be built at Dinghai Changhong, starting on August 8, 2025, and put into operation on July 24, 2026, with a lifting capacity of 50,000 tons, dimensions of 310*63.4, and a tonnage calculated at 250,000.