The 7th 2500 TEU container ship CHB083 of Changhong International was successfully launched.

Release time:

2023-09-12


9Month11Afternoon16Hour58, Changhong International built for the shipowner Shangjing Logistics2500Box No.7Ship (hull numberCHB083) at2No. shipyard successfully passed the transfer floating dock through hydraulic trolley and completed the launch smoothly. Leaders from relevant departments of the company, shipowners, and representatives from ship inspection,SMTSupervision team and project team members attended the launching ceremony.

After the ship is launched, it will be towed to the dock for outfitting operations, entering a tense phase of equipment installation and debugging. The project team will break down the production plan step by step, closely monitor each link, overcome difficulties, apply pressure on themselves, and strive to achieve the delivery goal. According to the company's annual plan, the ship will be delivered to the shipowner by the end of11the month.

This ship type was developed and designed by the China International Marine Containers (Group) Co., Ltd. Design and Research Institute, and is a new generation of"Bangkok's largest" container ship, featuring large carrying capacity, many container slots, low fuel consumption, and energy-saving and environmentally friendly characteristics,EEDImeetsPhase IIIrequirements.

A total of8ships of this type have been successfully delivered to customers5ships, the7ship was launched on8Month29and entered the dock outfitting stage, the8ship also completed the keel laying and entered the shipyard assembly stage on9Month1The total length of the ship is171.95meters, the beam is32.2meters, the depth is16.7meters, and the design speed is18knots, classified by Lloyd's Register of Shipping.