The sixth 2500 TEU container ship (CHB083) has commenced construction.
Release time:
2022-09-01
8Month30Morning8Hour58Minutes, the sixth container ship built by Zhoushan Changhong International for Shangjing Logistics2,500 TEUContainer ship (CHB083) has successfully started construction in the processing workshop.A5This type of ship is developed and designed by the China International Marine Containers (Group) Ltd. The total length of the ship is171.95meters, the beam is32.2meters, the depth is16.7meters, and the design speed is18knots, classed by Lloyd's Register of Shipping.
Press recommend