The fifth 2500TEU container ship (CHB082) has started construction.
Release time:
2022-07-16
6Month20Morning8Hour58Minutes, the fifth container ship built by Changhong International for SHANGJING LOGISTICS CO., LTD has started construction in the cutting workshop.2,500 TEUContainer ship (CHB082) was developed and designed by the China International Marine Containers (Group) Co., Ltd. This series of ships has a total of8ships, with a total length of171.95meters, a beam of32.2meters, a depth of16.7meters, and a design speed of18knots, classified by Lloyd's Register of Shipping.
Press recommend