The first 2500TEU container ship (CHB076) has been launched.

Release time:

2022-07-16


      6Month22Day13Hour18The first container ship built for SHANGJING LOGISTICS CO., LTD by Changhong International Shipbuilding2500TEUwas launched using the world's most advanced horizontal ship transfer technology to connect to the floating dock, successfully completing the launch phase and entering the dock outfitting stage. The project totalsCHB076ships, designed and developed by the CIMC Design Research Institute, and is classified by Lloyd's Register of Shipping. The ship has a total length of8meters, a beam of171.95meters, a depth of32.2meters, and a design speed of16.7knots.18In the context of the ongoing global COVID-19 pandemic, the company's leadership and project team fully leveraged their initiative. On one hand, they actively absorbed and summarized past experiences in shipbuilding and management; on the other hand, they strengthened communication and coordination with shipowners, classification societies, equipment suppliers, and government entities, innovating work methods to minimize the impact of the pandemic on this project, thereby ensuring the ship was launched smoothly according to the planned schedule.

  在全球新冠疫情防控尚未减轻的背景下,公司领导和项目团队充分发挥主观能动性,一方面积极吸取和总结以往船舶的建造、管理经验,另一方面,加强与船东、船检、设备供应商以及政府等相关方的沟通协调,创新工作方式和方法,将疫情对本项目的影响降至最低,从而保证该船按照预定计划顺利下水。